» Secured 54 MW Burgangchhu Hydropower Project worth Nu 990 million. Completed the Jomri exploratory drift work in October.
» Daylighted the HRT from CDCL.:s Face 7 side towards HCC's Face 6 end for the Nikachhu project.
» Completed the concrete lining of Face 8 with a length of 1415 meters which was the first concrete lining works to be undertaken by CDCL.
» Handed over two blocks of 96-bedded hostel using pre- engineered buildings to the Gedu College of Business Studies
» Continued to execute projects employing only national workforce, from engineers to the workers on the ground.
Company | Particulars | 2022 | 2021 |
---|---|---|---|
CDCL | Total Assets | 1,992.88 M | 2,259.83 M |
Net Worth | 880.98 M | 873.25 M | |
Income | 1,064.85 M | 1,311.64 M | |
Expenditure | 1,041.79 M | 1,375.26 M | |
PBT | 23.07 M | (63.62) M | |
Tax | 1.76 M | (3.09) M | |
PAT | 24.83 M | (66.71) M |